This article is about the CAC v2.
- Select the Levels tab.
- Select the plus sign (+) associated with the node you want to copy.
- Select Copy Level from the menu.
- Select the plus sign (+) associated with the node you want to copy to.
- Select Paste Level to paste the level.
Comments
0 comments
Please sign in to leave a comment.