View assigned and unassigned metrics per level Caitlin Bullivant February 15, 2021 12:41 Updated Follow This article is about the CAC v2. Select the Levels tab. Select a level in the organization structure. Select the Configure list and select Metric overrides. Related articles Export assigned metrics per level Assign and unassign materials by level View assigned and unassigned materials Comments 0 comments Please sign in to leave a comment.
Comments
0 comments
Please sign in to leave a comment.